Select Page

The City of Erlanger has contracted with Jefferson Contracting LLC for the Phase 3 Erlanger Road Reconstruction Project. This project will be a full removal and replacement of the roadway from Riggs Avenue to 579 Erlanger Road. The removal and replacement will be completed in sections as to not have everyone out of their driveways at one time. This project is scheduled to begin the week of July 30, 2018 with the portion of roadway from the entrance to A.J. Lindeman Elementary School to Greenfield Lane being completed first to aid in the traffic flow as school begins. Residents will be notified by the contractor prior to removal of pavement in front of each residence. Once the pavement has been removed and replaced, there will be a 7-day curing period before the section of roadway can be driven on and access to driveways are permitted. We appreciate your cooperation and patience during this project. Feel free to contact us with any comments or questions at info@erlangerpw.com, 859.727.7998, or 859.727.3893. Thank you.